Ohio Logistics –Pond Bank Stabilization

Ohio Logistics – Pond Bank Stabilization

E&S Services was contracted to help solve a major erosion problem on the bank of a retention pond at an Ohio Logistics site. The pond needed some minor dredging and then most importantly an installation of stone around the bank to give it a nice clean look while avoiding further erosion in the future. 
Share by: